Monthly Archives: March 2009

studio9-01-2

design, build, move > new studio

This is a new series of posts documenting my process of creating a new studio. The space will serve as a personal art studio. Heavybubble HQ and gallery space. This requires some careful thought. Gathering requirements, physical attributes and needs; all contribute to a successful outcome.

biocosmic : New Curator : ArtFriday

Excited to have another draw­ing included in Art Fri­day, March 20. see the post here: http://newcurator.com/2009/03/artfriday/ Blogged with the Flock Browser //

printmaking trip to Exquisite Letterpress

Ok. Soon I will go crazy if I don’t take a trip to friend Peter Fra­ter­deus’ printshop. Been talk­ing about mak­ing let­ter­press prints of Egypt­ian Waters for months now. Time to stop talk­ing and head out there on a ROAD TRIP. Will be tak­ing sheets … Read More

beyond swimmers : New Curator : ArtFriday

see the post here: http://newcurator.com/2009/02/art-friday-part-2/ Blogged with the Flock Browser //